The company “Neimari” d.o.o. was hired for the ongoing maintenance works (replacement of exterior joinery and renovation of the facade) at the national monument “Secondary School of Agriculture, Nutrition, Veterinary Medicine and Service Activities” at 55 Hamdije Kreševljakovića Street in Sarajevo.
The renovation works on two facades in the atrium area has been completed so far, whereas works on the remaining two are in process. In the atrium, the external carpentry was replaced, and tin benches were installed. The contractor used the winter period to finish making the remaining openings of the exterior joinery for the above-mentioned building in the workshop. So far, 201 windows have been installed throughout the building. The carpentry is wooden, finished painted in white, made according to the existing openings.
In the following period, after finishing the preparatory works and as weather conditions permit, the contractor will begin the final painting of the facade.
Expert supervision was performed by Dženana Šaran and Azer Aličić.