May 4, 2026

Report on the work of the Institute for the Protection of Monuments for the period from 27 to 30 April 2026

  • Expert supervision of the facade renovation works on the National Bank of Bosnia and Herzegovina building was carried out in the presence of the contractor ITC Zenica and the supervisory authority, as well as representatives of the designer Urbing Sarajevo and responsible persons from the Bank;
  • -Analysis and preparation of an expert opinion for the renovation of the building on Titova – Drage Palavestre Street in Mostar at the request of the “Stari grad” Mostar agency;
  • At the request of Muhamed Velagić and unnamed citizens, a request was sent to the Federal Inspection for action within the jurisdiction of the buildings “Elektrana na Hisetima” in Sarajevo, the building on Dehema Mulabdića Street, number 2, and Velagićevina in Blagaj.