On 16 November 2026, the Institute for the Protection of Monuments conducted professional conservation supervision of the works on the Gazi Husrev-beg Waqf Administration building in Sarajevo. It was determined that the routine maintenance works are being carried out in accordance with the project documentation—titled “Elaborate on the Routine Maintenance of the Gazi Husrev-beg Waqf Complex and Surrounding Structures (Gazi Husrev-beg Waqf Administration, Imaret, and the Clock Tower) in Sarajevo”—and the professional opinion of the Institute for the Protection of Monuments.
According to the project documentation, the works include replacing the dilapidated roof covering with a new one, installing new sheet-metal flashings and snow guards, and interior painting.
An inspection of the completed work revealed that, following the work on the interior wall surfaces, the existing, dilapidated roof covering was replaced—a process that also included replacing the substructure, sheet-metal flashings, and snow guards.
The works are being executed to a high standard and in compliance with the prescribed protection measures.