Conservation and restoration works on the Gazi Husrev-bey’s Waqf Administration building in Sarajevo are being carried out on the basis of the project documentation “Study on the routine maintenance of the Gazi Husrev-bey’s Waqf building with adjacent buildings (Gazi Husrev-bey’s Waqf Administration, Imaret and Clock Tower) in Sarajevo” and the expert opinion of the Institute for the Protection of Monuments.
The building in question forms part of the “Group of buildings – Gazi Husrev-bey’s Waqf in Sarajevo with movable property”, declared a national monument of Bosnia and Herzegovina by a Decision of the Commission to Preserve National Monuments of Bosnia and Herzegovina at a session held from 12 to 18 May 2009.
The protection measures established by the Decision on the Declaration of a National Monument apply to the national monument.
According to the project documentation, the routine maintenance works include the following:
- replacement of the deteriorated roof covering (ceramic tiles) with a new one, including replacement of the substructure,
- installation of new sheet-metal flashings and snow guards,
- interior painting and decorating works, as well as façade works.
An inspection of the works carried out established that the works on the interior wall surfaces had been completed, that they had been executed to a high standard and in accordance with the prescribed protection measures. The façade works, installation of the new roof substructure, laying of the new roof covering (ceramic tiles) and installation of new sheet-metal flashings will follow.
Photo gallery
3 photos



