| 14.10. 2025 | Jusovina No. 12, Mostar |
The Stari grad Agency in Mostar contacted the Institute for the Protection of Monuments with a request for an expert opinion on the “Project for the routine maintenance of the roof of a residential and commercial building” at Jusovina No. 12 in Mostar, prepared by the authorised design company “INTERPROJEKT” d.o.o. Mostar.
The Historical Urban Landscape of Mostar was declared a national monument of Bosnia and Herzegovina (Official Gazette of BiH, No. 66/19). National monuments are subject to the protection measures established by the Law on the Implementation of Decisions of the Commission to Preserve National Monuments, established pursuant to Annex 8 to the General Framework Agreement for Peace in Bosnia and Herzegovina (Official Gazette of the Federation of BiH Nos. 2/02, 27/02, 6/04 and 51/07). The complex in question forms part of the area of the national monument, Article 1, paragraph 3 of the aforementioned Decision.
Upon reviewing the submitted documentation, it was established that all the planned works are exclusively routine maintenance works which will not endanger the national monument and are necessary for the proper and safe functioning of the building.
The following works are planned:
- Replacement and repair of the roof covering of the building made of broken stone slabs, including replacement of the ridge tiles,
- Repair of any damaged roof structure, up to 10%, and
- Replacement of vertical and horizontal gutters and sheet-metal flashings.
The technology and materials specified in the bill of quantities are aligned with good practice for works on national monuments.
The Institute is of the opinion that approval may be granted for the works planned under the aforementioned project, in the manner explained in the technical description and the bill of quantities.
Any deviation from the works planned by the project shall be sanctioned in accordance with the applicable legislation.
The investor is obliged to notify the Institute for the Protection of Monuments of the exact commencement date of the works in question, so that the Institute may carry out timely expert supervision as part of its statutory obligation.
| 14. 10. 2025. | Mala Tepa No. 24, Mostar |
The Stari grad Agency in Mostar contacted the Institute for the Protection of Monuments with a request for an expert opinion on the “Project for the routine maintenance of the Consulate General of the Republic of Türkiye” at Mala Tepa No. 24 in Mostar, prepared by the authorised design company “ARHI-PLUS” d.o.o. Mostar.
The Historical Urban Landscape of Mostar was declared a national monument of Bosnia and Herzegovina (Official Gazette of BiH, No. 66/19). National monuments are subject to the protection measures established by the Law on the Implementation of Decisions of the Commission to Preserve National Monuments, established pursuant to Annex 8 to the General Framework Agreement for Peace in Bosnia and Herzegovina (Official Gazette of the Federation of BiH Nos. 2/02, 27/02, 6/04 and 51/07). The complex in question forms part of the area of the national monument, Article 1, paragraph 3 of the aforementioned Decision.
Upon reviewing the submitted documentation, it was established that all the planned works are exclusively routine maintenance works which will not endanger the national monument and are necessary for the proper and safe functioning of the building.
The works planned comprise the repair of the building’s roof covering made of broken stone slabs, including replacement of the ridge tiles and repair of any damaged roof structure, as well as the repair of the metal window shutters by sandblasting and repainting with protective paint.
The technology and materials specified in the bill of quantities are aligned with good practice for works on national monuments.
The Institute is of the opinion that approval may be granted for the works planned under the aforementioned project, in the manner explained in the technical description and the bill of quantities.
Any deviation from the works planned by the project shall be sanctioned in accordance with the applicable legislation.
The investor is obliged to notify the Institute for the Protection of Monuments of the exact commencement date of the works in question, so that the Institute may carry out timely expert supervision as part of its statutory obligation.
| 14.10.2025. | Braće Đukića No. 2, Mostar |
The owners of the building, Adnan Efica and Džanan Šarkić from Mostar, contacted the Institute for the Protection of Monuments within the Federal Ministry of Culture and Sport with a request for an expert opinion on the “Project for the routine maintenance of a residential building” at Braće Đukića No. 2 in Mostar, prepared by the authorised design company “ARHI-PLUS” d.o.o. Mostar.
The Historical Urban Landscape of Mostar was declared a national monument of Bosnia and Herzegovina (Official Gazette of BiH, No. 66/19). National monuments are subject to the protection measures established by the Law on the Implementation of Decisions of the Commission to Preserve National Monuments, established pursuant to Annex 8 to the General Framework Agreement for Peace in Bosnia and Herzegovina (Official Gazette of the Federation of BiH Nos. 2/02, 27/02, 6/04 and 51/07). The complex in question forms part of the area of the national monument, Article 1, paragraph 3 of the aforementioned Decision.
Upon reviewing the submitted documentation, it was established that the planned works comprise:
- Replacement of the roof covering and sheet-metal flashings,
- Repair and painting of the façade,
- Repair of the interior floors, and
- Repair of the internal joinery.
The Institute is of the opinion that approval may be granted for the works planned under the aforementioned project, in the manner explained in the technical description and the bill of quantities.
Any deviations from the works planned by the project shall be sanctioned in accordance with the law.
The investor is obliged to notify the Institute for the Protection of Monuments of the exact commencement date of the works in question, so that the Institute may carry out timely expert supervision as part of its statutory obligation.
| 14. 10. 2025. | Bulevar, Mostar |
The Institute for the Protection of Monuments received a request from the Department for Urban Planning and Construction of the City of Mostar for an expert opinion on the request submitted by Autostart Solar 2 d.o.o. Mostar for the installation of an LED display on the plot designated as cadastral parcel 4328, cadastral municipality Mostar II.
The Historical Urban Landscape of Mostar was declared a national monument of Bosnia and Herzegovina (Official Gazette of BiH, No. 66/19). National monuments are subject to the protection measures established by the Law on the Implementation of Decisions of the Commission to Preserve National Monuments, established pursuant to Annex 8 to the General Framework Agreement for Peace in Bosnia and Herzegovina (Official Gazette of the Federation of BiH Nos. 2/02, 27/02, 6/04 and 51/07). The building in question forms part of the area of the national monument, Article 1, paragraph 3 of the aforementioned Decision.
Upon reviewing the submitted documentation and the decision of the Commission to Preserve National Monuments, and pursuant to Article 3, paragraph 1.1.4 of the Decision, the request in question must be forwarded to the Commission to Preserve National Monuments for the issuance of a prior opinion on its compliance with the Decision.
| 14. 10. 2025. | Štrosmajerova No. 1, Sarajevo |
The Institute for the Protection of Monuments was contacted by the Urban Planning Service of the Stari Grad Municipality of Sarajevo with a request for an extension of Decision No. UP-I-05-19-975/24-DG, granting approval for the installation of the Australian flag on the façade of the building at Štrosmajerova No. 1.
Upon reviewing the submitted documentation and inspecting the site, it was established that the building in question falls within the area of the BiH national monument entitled the Historical Urban Landscape of Sarajevo (Official Gazette of BiH Nos. 1/21 and 10/21), to which the protection measures established by the Law on the Implementation of Decisions of the Commission to Preserve National Monuments, established pursuant to Annex 8 to the General Framework Agreement for Peace in Bosnia and Herzegovina, apply (Official Gazette of the Federation of BiH Nos. 2/02, 8/02, 27/02, 6/04 and 51/07).
Upon reviewing the submitted documentation and inspecting the site, the Institute is of the opinion that a favourable expert opinion may be issued on the extension of the approval for installing the Australian flag on the façade of the building in question.
| 14. 10. 2025 | Kakanj Majlis of the Islamic Community |
The Kakanj Majlis of the Islamic Community contacted the Institute for the Protection of Monuments with a request for approval to carry out works to replace the damaged coping on the previously constructed courtyard wall of the mosque courtyard in Kraljeva Sutjeska.
The mosque in Kraljeva Sutjeska, together with its courtyard and cemetery, was declared a national monument of BiH in October 2003 (Official Gazette, No. 12/04), to which the protection measures established by the Law on the Implementation of Decisions of the Commission to Preserve National Monuments, established pursuant to Annex 8 to the General Framework Agreement for Peace in Bosnia and Herzegovina, apply (Official Gazette of the Federation of BiH Nos. 2/02, 8/02, 27/02, 6/04 and 51/07).
After reviewing the file and the photographs submitted, the Institute states that approval may be granted for the replacement of the damaged coping on the previously constructed stone courtyard wall.
The Contractor engaged to construct the double stone harem wall is advised to carefully remove the existing coping, thoroughly clean the existing substrate with brushes and a compressor, apply primer and reinstall a new coping of the same dimensions and petrographic characteristics as the existing damaged coping. Following installation, the joint between the coping and the wall should be pointed in the colour of the existing joints.
If unforeseen circumstances or any problems arise during the installation of the coping in accordance with the above, the Contractor shall contact the Institute so that they may be rectified.
| 14. 10. 2025 | Baščaršija 2, Sarajevo |
The Institute for the Protection of Monuments was contacted by the Department for Urbanism, Spatial Planning and Environmental Protection of the Municipality of Stari Grad Sarajevo with a request from Senad and Senija Dizdarević of Sarajevo for the issuance of approval for the installation of a façade awning on the façade of the building located at Baščaršija 2 in Sarajevo.
The building in question is situated at Baščaršija 2 and falls within the scope of the national monument of BiH entitled the Sarajevo Historic Urban Landscape (“Official Gazette of BiH”, Nos. 1/21 and 10/21), to which the protection measures established by the Law on the Implementation of Decisions of the Commission for the Preservation of National Monuments Established Pursuant to Annex 8 to the General Framework Agreement for Peace in Bosnia and Herzegovina (“Official Gazette of the Federation of BiH”, Nos. 2/02, 8/02, 27/02, 6/04 and 51/07) apply.
Upon reviewing the file submitted by the Department for Urbanism, Spatial Planning and Environmental Protection of the Municipality of Stari Grad, which contains the urban planning and technical requirements for the installation of the awning, the main awning design prepared in August 2025 by the design company “FOCUS” of Sarajevo, and the site inspection, the Institute established that the awning had already been installed in the dimensions and colour specified in the aforementioned urban planning and technical requirements, with which the Institute concurs.
Accordingly, the Institute considers that approval may be granted for the awning already installed.
This expert opinion concerns the aspect of cultural and historical heritage and shall remain valid until the expiry of the deadline set by the Municipality or until the adoption of the Rulebook with Guidelines for the Installation of Advertisements in the Sarajevo Historic Urban Landscape. The investor is obliged to settle all contractual obligations with the competent department of the Municipality of Stari Grad Sarajevo.
| 15. 10. 2025. | JU SŠ poljoprivrede, prehrane, veterine i uslužnih djelatnosti |
As part of regular professional supervision activities, an inspection was carried out of the façade renovation works at JU Srednja škola poljoprivrede, prehrane, veterine i uslužnih djelatnosti. In addition to the Institute’s team, the inspection was attended by: Ensar Mulaomerović, BArch, a representative of the contractor “Neimari” d.o.o., and Amela Pirkić, representing the supervising company “IPSA” Sarajevo.
Following the removal of the scaffolding, as agreed at the previous meeting, a final inspection of the completed façade works was carried out. The Institute’s representatives established that the restoration of the decorative plasterwork and painting had been executed properly and to a standard that meets the Institute’s requirements, with only minor suggestions.
This concluded the Institute’s professional supervision of the works. Following the corrections suggested by the Institute and the supervising body, which are planned to be completed by the end of October, another inspection will be carried out at the request of the contractor and the supervising body, after which the report will be submitted to the investor, the City Administration of the City of Sarajevo.
It was agreed with the Contractor that the stated repairs would be completed by 31. 10. 2025, and that the completed repairs would be inspected on 5. 11. 2025. If everything is completed by that date, the Institute’s expert team will initial the documents so that the representative responsible for daily supervision can prepare the final report for the client, the City Administration, the Ministry of Education and Upbringing of Sarajevo Canton and the Municipality of Stari Grad.
| 17. 10. 2025. | Saliha Hadžihuseinovića Muvekita 5, Sarajevo |
The Institute for the Protection of Monuments was contacted by Faris Hamaluka with a request for the issuance of approval to carry out routine maintenance works, including the replacement of the roof covering, roof windows and part of the roof beams on the residential building at Saliha Hadžihuseinovića Muvekita 5 in Sarajevo.
The building in question is situated at Saliha Hadžihuseinovića Muvekita 5 and falls within the scope of the national monument of BiH entitled the Sarajevo Historic Urban Landscape (“Official Gazette of BiH”, Nos. 1/21 and 10/21), to which the protection measures established by the Law on the Implementation of Decisions of the Commission for the Preservation of National Monuments Established Pursuant to Annex 8 to the General Framework Agreement for Peace in Bosnia and Herzegovina (“Official Gazette of the Federation of BiH”, Nos.: 2/02, 8/02, 27/02, 6/04 and 51/07) apply.
Upon reviewing the request, which included an expert opinion with photographs of the existing condition of the roof structure in the residential unit at the above-mentioned address, prepared in April 2025 by the company “StrEng d.o.o. of Sarajevo, the Institute established that the works constitute routine maintenance and advised the applicant, given that the roof covering is to be replaced, to take advantage of the favourable weather conditions and commence the remedial works as soon as possible. Accordingly, the Institute considers that approval may be granted for the above-mentioned works.
| 17. 10. 2025. | Braće Fejića 70d, Mostar |
The Institute for the Protection of Monuments was contacted by Mersija Omerović with a request for the issuance of approval for the installation of an awning on the residential and commercial building located at Braće Fejića 70d in Mostar.
The building in question is situated at Braće Fejića 70d and falls within the scope of the national monument of BiH entitled the Historic Urban Landscape of Mostar (“Official Gazette of BiH”, No. 66/19), to which the protection measures established by the Law on the Implementation of Decisions of the Commission for the Preservation of National Monuments Established Pursuant to Annex 8 to the General Framework Agreement for Peace in Bosnia and Herzegovina (“Official Gazette of the Federation of BiH” No. 2/02, 27/02, 6/04 and 51/07) apply.
Upon reviewing the submitted file, which included the design documentation with photographs prepared in July 2025 by the design company “delta-Z Infinitinet” d.o.o. of Mostar, the Institute established that this was a cantilevered, articulated awning with a metal substructure, which had already been installed in the colour and size specified in the design.
In accordance with the above, and noting that the position of the open awning does not obstruct pedestrian movement at Braće Fejića 70d, the Institute considers that approval may be granted for it.